Project Date: 1/12/2025
Estimated Completion Date: 7/01/2026
Project Status: FINISHED
Project Type: Large Size
This commission goes beyond a basic export. It involves fully recreating the project from scratch, covering multiple creative aspects and carefully analyzing every part of the stage.
The Gelredome stadium model is ready; the textures are being packaged and uploaded to the corresponding Drive. It might take some time due to our current internet speeds, so it could take several hours


It was decided to redesign part of the GelreDome, completely updating the roof, the VIP areas, and the lateral stands, making them larger and more optimized. This included changing the color scheme and fixing various design errors in the interior of the stadium that was originally recreated in 2022.
Likewise, the structures will be gradually adapted, starting with the trusses, speakers, and curved trusses to fit the new stadium. The mainstage section will also need to be readapted and certain parts modified so they are properly adjusted to the desired scale and have correct optimization.
BEFORE

AFTER

ADAPTED TRUSSES

QLIMAX 2018 I The Game Changer Complete Edition



